Tubería Moldeada Centrífugamente

The HOBAS Centrifugal Casting Process is a fully automated production process. A computer program controls the feeder arm, which continuously inserts the three basic components, glass fiber (GF), unsaturated polyester resin (UP) and aggregates, into the over 6-meter-long rotating mold. This is how the pipe is produced layer by layer.

Enlace Ciudad:
País:
Año: Largo Total [m]: Diámetro Nominal DN [mm]: Presión Nominal PN [bar]: Rigidez Nominal SN [N/m²]:
Renovation of an Old Sewer in the Coastal City of Guayaquil
Category: Tubería Moldeada Centrífugamente
Guayaquil
Ecuador
2014 84 1400 1 10000
Renovation of Stormwater Sewer with HOBAS Pipes beneath Zürich Airport
Category: Tubería Moldeada Centrífugamente
Zürich
Suiza
2013 - 2014 170 1900 1 5000
Rehabilitation of a Double, Gravity Potable Water Line in Budapest with CC-GRP HOBAS Pipes and HOBA...
Category: Tubería Moldeada Centrífugamente
Budapest
Hungría
2004 - 2006 6000 No-Circulares | 900 | 1300 1 2500
Rehabilitation of Potable Water Pipelines in Budapest
Category: Tubería Moldeada Centrífugamente
Budapest
Hungría
2011 1100 1000 | 1500 1 2500
HOBAS Potable Water Systems in Afghanistan
Category: Tubería Moldeada Centrífugamente
Kabul
Afganistán
2004 60000 150 | 500 10
Sewage and Drainage System at Schiphol Airport in Amsterdam, NL
Category: Tubería Moldeada Centrífugamente
Schipol
Holanda
2003 - 2013 1280 300 | 1600 1 16000 | 32000
Microtunneling HOBAS GRP Culverts under the E65 Railway Line in Poland
Category: Tubería Moldeada Centrífugamente
Ciechanów
Polonia
2010 - 2011 94 1700 | 2000 1 64000 | 100000
HOBAS GRP Gravity Pipes for New Sewer System in Libava, CZ
Category: Tubería Moldeada Centrífugamente
Libava
República Checa
2015 - 2016 5142 250 | 300 1 10000
New HOBAS Sewer System On Track in Slovakia
Category: Tubería Moldeada Centrífugamente
Western Slovakia
Elovaquia
2013 - 2016 4600 200 | 600 | 800 | 1800 1 10000
Renovation of 60-year-old Sewer System in Szombathely, HU
Category: Tubería Moldeada Centrífugamente
Szombathely
Hungría
2015 294 500 | 600 | 900 1 10000
HOBAS Pipes Do a Power of Good
Category: Tubería Moldeada Centrífugamente
Bouchain
Francia
2014 700 1400 | 2200 6 10000
HOBAS Ensures Safe Sea Water Discharge in France
Category: Tubería Moldeada Centrífugamente
Saint-Nazaire
Francia
2014 216 1200 6 10000
Highly Durable HOBAS Pipes for Safe Paper Production in Austria
Category: Tubería Moldeada Centrífugamente
Hallein
Austria
2014 - 2015 990 1100 1 10000
HOBAS Pipes Withstand Salt and Chlorine in Chemical Plant in Ukraine
Category: Tubería Moldeada Centrífugamente
Odesa
Ucrania
2014 388 400 6 5000 | 10000
Record Size Microtunnelling with HOBAS CC-GRP Pipes De 3270 in Poland
Category: Tubería Moldeada Centrífugamente
Warsaw
Polonia
2014 - 2015 3204 3270 1 64000
Rehabilitation with HOBAS Pipes in Germany
Category: Tubería Moldeada Centrífugamente
Cologne
Alemania
2013 80 1280 1
Successful Installation of the First HOBAS CSO Chamber in Switzerland
Category: Tubería Moldeada Centrífugamente
Pfaeffikon
Suiza
2017 15 800 | 1800 1 10000
HOBAS CC-GRP Culverts DN 3000 Jacked Under Railway
Category: Tubería Moldeada Centrífugamente
Cikowice
Polonia
2014 136 3000 1 40000 | 64000
Circular HOBAS GRP Pipes Renovate Aged Sewer Networks in Luxembourg
Category: Tubería Moldeada Centrífugamente
Wasserbillig
Luxemburgo
2014 120 600 1 40000
Reliable Wastewater Discharge with HOBAS Jacking Pipes
Category: Tubería Moldeada Centrífugamente
Brno
República Checa
2012 - 2013 1265 1280 1 64000

Los resultados de la búsqueda exceden las 20 referencias, por favor modifique su búsqueda.