Alcantarillado por Gravedad
HOBAS Non-Pressure Pipes made of glass fiber reinforced plastics (GRP) are used as gravity lines for wastewater disposal as well as for various other applications.
Enlace | Ciudad: País: |
Año: | Largo Total [m]: | Diámetro Nominal DN [mm]: | Presión Nominal PN [bar]: | Rigidez Nominal SN [N/m²]: |
---|---|---|---|---|---|---|
Extension of a wastewater tunnel with HOBAS Pipes Category: Alcantarillado por Gravedad |
Austin USA |
2010 - 2012 | 6000 | 1400 | 2200 | 1 | 10000 |
Modernization of Sewer Pipeline System in Ljubljana Category: Alcantarillado por Gravedad |
Ljubljana Eslovenia |
2008 - 2009 | 3275 | 1200 | 2400 | 1 | 10000 |
Renovation of an Old Sewer in the Coastal City of Guayaquil Category: Alcantarillado por Gravedad |
Guayaquil Ecuador |
2014 | 84 | 1400 | 1 | 10000 |
GRP Pipes for Renovating Airport Drainage System at Schiphol International Airport Category: Alcantarillado por Gravedad |
Schiphol Holanda |
2009 | 7300 | 300 | 1600 | 1 | 16000 |
Double Pipe Sewer System for the Marche Region in Italy Category: Alcantarillado por Gravedad |
Torraccia Italia |
2009 | 1400 | 400 | 500 | 1 | 10000 |
Auger Boring Through Lecce Limestone With HOBAS Pipes Category: Alcantarillado por Gravedad |
Lecce Italia |
2014 - 2015 | 3796 | 800 | 860 | 1 | 15000 | 32000 |
New HOBAS Sewer Line Installed for Supermarket Chain in Romania Category: Alcantarillado por Gravedad |
Lugoj Romania |
2016 | 2200 | 300 | 900 | 1 | 10000 |
Wastewater Treatment Plant in Texas Renovated With HOBAS Pipes, US Category: Alcantarillado por Gravedad |
Brownsville USA |
2012 - 2014 | 211 | 1350 | 1800 | 1 | |
HOBAS GRP Gravity Pipes for New Sewer System in Libava, CZ Category: Alcantarillado por Gravedad |
Libava República Checa |
2015 - 2016 | 5142 | 250 | 300 | 1 | 10000 |
New HOBAS Sewer System On Track in Slovakia Category: Alcantarillado por Gravedad |
Western Slovakia Elovaquia |
2013 - 2016 | 4600 | 200 | 600 | 800 | 1800 | 1 | 10000 |
Renovation of 60-year-old Sewer System in Szombathely, HU Category: Alcantarillado por Gravedad |
Szombathely Hungría |
2015 | 294 | 500 | 600 | 900 | 1 | 10000 |
Highly Durable HOBAS Pipes for Safe Paper Production in Austria Category: Alcantarillado por Gravedad |
Hallein Austria |
2014 - 2015 | 990 | 1100 | 1 | 10000 |
HOBAS NC Line Next to the Danube Category: Alcantarillado por Gravedad |
Hößgang Austria |
2014 | 74 | No-Circulares | ||
Customized NC HOBAS Profiles for Sewer Rehabilitation near Paris Category: Alcantarillado por Gravedad |
Ville-d’Avray Francia |
2015 | 1400 | No-Circulares | ||
Sewer line brought back to service with non-circular HOBAS GRP Profiles Category: Alcantarillado por Gravedad |
Groningen Holanda |
2015 | 277 | No-Circulares | ||
HOBAS NC Line for Budapest’s Main Sewage Collector Category: Alcantarillado por Gravedad |
Budapest Hungría |
2012 | 876 | No-Circulares | ||
Rehabilitation with HOBAS Pipes in Germany Category: Alcantarillado por Gravedad |
Cologne Alemania |
2013 | 80 | 1280 | 1 | |
HOBAS Pipes jacked at Victoria Harbour, AUS Category: Alcantarillado por Gravedad |
Melbourne Australia |
2012 - 2013 | 150 | 400 | 1 | 100000 |
HOBAS GRP for Australia’s Largest Ever Pressure Jacking Project in Gold Coast Category: Alcantarillado por Gravedad |
Gold Coast Australia |
2013 | 1525 | 700 | 750 | 960 | 1 | 10 | 32000 | 64000 | 640000 |
Successful Installation of the First HOBAS CSO Chamber in Switzerland Category: Alcantarillado por Gravedad |
Pfaeffikon Suiza |
2017 | 15 | 800 | 1800 | 1 | 10000 |
Los resultados de la búsqueda exceden las 20 referencias, por favor modifique su búsqueda.
Alcantarillado por Gravedad, Tubería a Presión, Tubería Inclinada, Tubería Protectora, Alcantarillado, Drenaje para Puentes, Tubería para Aguas Termales, Aeropuerto, Edificio, Area de Protección de Aguas, Tubería Filtro, Shaft para Vertedero, Ferrocarril, Tubería para Vertedero, Penstock, Sifón Invertido, Tubería de Aire, Calle Principal, Tubería para Túneles, Tubería Pozo, Renovación de Shaft, Almacenamiento de Alcantarillado, Area de Hundimiento, Acceso a Alcantarillado, Tubería de Drenaje, Acceso a Alcantarillado Tangencial, Línea de Pickling, Central Eléctrica, Industria del Metal, Silo, Planta Desalinizadora, Planta de Incineración, Industria del Papel, Refinería, Autopista, Producción de Cloro, Industria Minera, Agua para Minería, Construcción de Spools, Tubería Moldeada Centrífugamente, Tubería Filamentada,